SABP Reprographics Blog Irvine Ranch Water District-Pipeline Replacement RFP

Irvine Ranch Water District (IRWD)- Pipeline ProjectName of Project: 6-Inch Domestic Water Pipeline Replacement to the Michelson Water Recycling Plant Air Gap Project Number: PR 07149, Code 7193 Project Manager: Malcolm Cortez, P.E. (949) 453-5854 Project Engineer: Thomas Bonkowski (949) 453-5692 Design Engineer: Joseph Gutierrez. P.E., JIG Consultants (714) 978-4407Bidders: Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List. Prequalification to be placed on the Project Bidders List for this Project is closed.Bid Opening Date Thursday, June 28, 2018 at 2:30 P.M.Location of Opening: Irvine Ranch