The wastewater system was not yet operational, but water suddenly flooded from the pipe. I was the project manager and construction was into the final stretch. We were about to set the wastewater system in operation. It was merely a matter of removing an end cap and opening the pipe towards the sewage pump basin.... Les mer »The post That time the stream flooded the basement - troubleshooting with StreamBIM appeared first on Streambim.